Contribution6 min read

Intralogistics automation: what a sequencing process delivered in six weeks teaches

Intralogistics automation pays off particularly where manual, recurring transport and sequencing steps set the pace. A documented case from VW's Gläserne Manufaktur shows, according to the company, that such a process can be fully automated with transport robots, a cobot and adapted load carriers, implemented in six weeks.

Photo: tools and parts on a black desk, including electrical tape, a lens and electronic components.

Intralogistics automation: what a sequencing process delivered in six weeks teaches

Intralogistics automation pays off particularly where manual, recurring transport and sequencing steps set the pace. A documented case from VW's Gläserne Manufaktur shows, according to the company, that such a process can be fully automated with transport robots, a cobot and adapted load carriers, implemented in six weeks.

Photo: tools and parts on a black desk, including electrical tape, a lens and electronic components.
Image: Wesley Goatley & BRAID / The Horizon II / Licenced by CC-BY 4.0

For decision makers in brief

  • Context: The case is an external industry example from our analysis of 52 published practitioner conversations (September 2025 to August 2026). It is a company statement, not a project we were involved in.
  • Effort: The bottleneck was not the technology but clarifying the physical workflow. Load carriers, routes and handover points had to fit the automated process.
  • Cost: According to the company, CO2 and cost per sequence fell by 50 %. For your own planning, the short implementation time matters most, because it lets you calculate the business case in months rather than years.
  • Risk: If AI in robots takes over a safety function, such as collision avoidance, stricter requirements apply. This needs to be clarified before the project starts.
  • Transferable: The pattern, not the solution. First clarify the process, then automate, then show a measurable result quickly.

The case: a sequencing process in the Gläserne Manufaktur

At VW's Gläserne Manufaktur, a previously manual sequencing process was automated. Autonomous transport robots, a cobot and wooden load carriers were used. The following details come from a published practitioner conversation and are labelled as a company statement in our industry report "AI in Manufacturing".

FeatureDetail
CompanyVW Gläserne Manufaktur
Starting pointManual sequencing process
Means usedAutonomous transport robots, cobot, wooden load carriers
Degree of automation100 %
CO2 per sequencereduced by 50 %
Cost per sequencereduced by 50 %
Implementation time6 weeks
Field of applicationLogistics, automation
Type of sourceCompany statement, own analysis

Two limitations belong to an honest assessment. First, the information is based on the published summary of the conversation, not on an independent review. Second, the source gives no details on investment volume or quantities. The case therefore serves as evidence of feasibility and speed, not as a template for a cost calculation.

Pattern 1: speed is the real currency

Only 14 of the 52 conversations analysed mention a result with a figure at all. Remarkably often, this figure does not prove the technology but the speed of implementation: six weeks at VW, ten months to start of production in a platform project, under 24 months per plant at Progroup.

This is no coincidence. If you are championing an initiative internally, the time to the first result convinces more than percentages. Economics add to this: according to BCG 2026 (consulting study), payback periods for AI projects in high-wage regions such as DACH are materially shorter than in low-wage regions, where comparable projects take two to eight times as long. The high cost pressure in industry is therefore also a strong argument for automation.

Predictable speed depends on a clear framework. The page on our AI project fixed price describes what such a framework with 72 hours to the first pilot and 4 to 10 weeks of implementation looks like.

Pattern 2: the lever lies before the AI

Several of the strongest figures from the conversations do not come from AI projects but from process work. The VW case, too, is primarily an automation project built on a reorganised workflow. Two further documented cases from intralogistics and material flow control show the same pattern:

CompanyMeasureResultType of source
Magna ExteriorsAutomated picking in automotive logistics97 % fewer walking distancesCompany statement, own analysis
RUWAC IndustriesaugerSwitching five halls from push to pullLead time and work in progress each reduced by 50 %Company statement, own analysis
VW Gläserne ManufakturTransport robots, cobot, wooden load carriers100 % automation in 6 weeksCompany statement, own analysis

Several interviewees state the same rule: first clarify the physical process, then automate. The industry report includes it as a separate step in its roadmap. For intralogistics this means that routes, handover points, load carriers and sequences are defined before any software decision. A robot that maps a disorganised workflow only automates the disorder.

Intralogistics automation: where AI comes in

Not every automation is AI. Transport robots and cobots often work with classic controls. AI comes in where planning, sequence and demand are continuously recalculated. According to Deloitte AI in Manufacturing 2026 (consulting study), 49 % of the manufacturers surveyed use AI in logistics and the supply chain, after quality at 62 % and production at 57 %.

In the industry report, this area belongs to field of application C, planning and supply chain. The prerequisites are clearly named there:

  • Reliable master data in the ERP, because no other field is as unforgiving of poor master data.
  • An order and sales history over several years, including outliers.
  • Realistic replenishment times per item, not the wishful values maintained in the system.
  • A single target metric, such as service level, stock coverage or delivery reliability.

A typical entry point is a defined item group, initially in parallel operation. The measure of success is not model quality but the measurable effect at the same service level. Our article on AI use cases in manufacturing shows which other fields exist and how mature they are.

Safety: when robots become relevant for regulation

As soon as AI takes over a safety function in a machine, the situation changes. The industry report gives examples such as camera-based monitoring of protected zones, AI-supported collision avoidance for cobots and adaptive speed limitation. In our reading, such machines fall under Annex I of the Machinery Regulation (EU) 2023/1230, which applies from 20 January 2027. Self-certification then no longer applies, and a notified body is required. From 2 August 2028, the high-risk obligations of the AI Act under Annex I are added.

This assessment is not legal advice. The specific classification depends on the function in the product and should be reviewed by a lawyer before the conformity assessment. Important for planning: in this reading, transport solutions that do not intervene in the safety chain generally remain outside the high-risk classification.

What you can take from the case

The VW case cannot be copied, its pattern can. For your own intralogistics automation project, five checkpoints emerge:

  • A manual, recurring process with a clear metric, such as walking distances, lead time or cost per operation.
  • A baseline taken from the system before the start.
  • A clarified physical workflow before robotics or software are procured.
  • An assessment of whether a safety function is affected.
  • Defined operations, so that systems are maintained, monitored and adjusted after go-live.

Many projects underestimate the last point. Regulated AI operations as a managed service define who monitors and retrains models when the product range, cycle times or layout change. Our page on AI for manufacturing companies describes which requirements apply specifically in production environments.

Frequently asked questions

Full-Stack Development

From Idea to Production in Weeks

Next.js, React, TypeScript - co-founded products with government funding support.

See Our Work

Related Articles

RETURN TO BLOG
Photo: seventeen colourful sticky notes with sketches about AI arranged on a whiteboard.
Contribution7 min read

AI use cases in manufacturing: the seven fields at a glance

AI use cases in manufacturing fall into seven fields: predictive maintenance, quality inspection, planning and supply chain, energy and process, knowledge and assistance, engineering and back office, and agentic systems. They differ widely in maturity, typical impact and data requirements. Your own data situation, not the technology, should therefore decide where you start.

October 27, 2026
ZIM funding freeze alternatives: options for AI projects
Contribution5 min read

ZIM funding freeze alternatives: which funding sources remain for AI projects

As of August 2026, the most important ZIM funding freeze alternatives for AI projects are KMU-innovativ, with its next deadline on 15 October 2026, regional programmes such as Digitalbonus Bayern and, in Switzerland, Innosuisse. The former standard federal programmes have expired. Plan your project so that it pays for itself from its own business case.

October 21, 2026
Paper collage: a person leans over a table and works carefully on a circuit board.
Contribution7 min read

Why AI projects fail: an implementation problem, not a technology problem

Why AI projects fail can be answered clearly for industry: rarely because of the technology, mostly because of the implementation. What is missing is data access, a baseline before the start, clear usage rules and operational ownership after the pilot. According to Deloitte 2026, only one AI use case in five in manufacturing is scaled across the company.

October 20, 2026
Mosaic-like image of clouds made of server and data centre components.
Contribution7 min read

Digital sovereignty for AI: how to make it verifiable

Digital sovereignty for AI only exists once you can prove where your models run, which data leaves your premises, who used what and how you can leave the provider again. It becomes verifiable through four criteria: location of processing, data flow, complete logging and the replaceability of the model.

October 13, 2026
How long does an AI implementation take?
Contribution7 min read

How long does an AI implementation take?

In practice, an AI implementation rarely takes longer than ten weeks to reach productive use. After a one-week assessment, a pilot is running internally within 72 hours; the rollout that follows takes 4 to 10 weeks depending on scope and system landscape.